Connecting CAD to ERP looks like an IT project. On the shop floor it fails when part numbers, units, revisions and release states are fuzzy. Use this CAD–ERP BOM sync checklist before writing adapters.
1. Data contract
- Single source of truth for item number (CAD, Vault/PDM, or ERP) — pick one owner.
- Unit of measure mapping written down (EA, M, KG) with examples.
- Revision / state rules: when may a BOM leave CAD?
- Phantom / kit / bulk items handled explicitly.
2. Process contract
- Who presses “publish BOM” — designer, checker, or Vault job?
- What happens on ECO / revision bump?
- How purchasing is notified of quantity changes.
3. Technical contract
- Push, pull, or both — and idempotent retries.
- Logging: every sync leaves a human-readable receipt.
- Pilot one product family before plant-wide rollout.
ENGIMANDI delivers this under CAD–ERP integration and broader CAD integration — including Vault-aware flows when PDM owns release.
Brief a BOM sync that survives purchasing
Send your CAD + ERP pair and one sample BOM export. Contact or WhatsApp +91-9677261485.