Painful revision control between AutoCAD and Odoo looks like this: engineering revises a drawing, purchasing still buys the old item, and nobody can prove when ERP learned about the change. Fixing it means treating revision and change control as software — not email.
What breaks today
- Revision letters updated in the title block only.
- Odoo BOMs edited by hand with no link to the DWG change.
- “Use latest” culture without status gates (draft / released / obsolete).
Production tooling pattern
- Define statuses both systems understand.
- On release, push revision + BOM snapshot toward Odoo.
- Block purchase of obsolete revisions where Odoo allows.
- Keep an audit of who released what and when.
ENGIMANDI implements this with AutoCAD–Odoo integration and change-aware CAD–ERP connectors.
Pilot advice
Start with one product line and a short ECO checklist. Prove that a revision in AutoCAD becomes a visible, actionable change in Odoo within minutes — not days.
Fix AutoCAD↔Odoo change control
Contact or WhatsApp +91-9677261485 with your revision scheme and Odoo apps.