A vague request gets a vague quote. Most CAD automation projects that overrun did not fail in the code. They failed because vendors priced different things, and nobody noticed until the first demo. A short, specific request for quotation (RFQ) prevents most of that. It takes a day or two to write well and saves weeks of comparing quotes that cannot be compared.
Start with the workflow, not the tool
Describe the task that wastes time, not the feature you want. For example: every new variant of a pump housing needs a six-sheet drawing set, a BOM export and a manual check against the standards sheet, and two engineers spend about a day on each variant. That sentence tells a vendor what to build, how to measure success and roughly what it is worth. Write down how often the task happens, who does it, what they produce and which errors cost the most.
What a good RFQ contains
- Your CAD and PDM versions, for example AutoCAD 2026 or Inventor 2026, and the operating systems your engineers use
- Two or three anonymised sample files: one typical case and one difficult case
- Your drawing or modelling standard, even if it is only a PDF of rules
- The systems the tool must connect to, such as the ERP, Vault or Teamcenter, with versions
- Who will use the tool and roughly how many people
- The deliverables: source code, documentation, training and installation support
- Your timeline and any fixed dates, such as a customer audit or a product launch
- How you will accept the work (see the acceptance section below)
What to leave out
Do not prescribe a technology unless you have a real reason, because it can rule out the best option before the vendor has looked at your work. Avoid vague phrases such as fully automated or AI-powered without a workflow behind them. And do not publish a fixed budget unless you want every quote to fit it, because vendors will then cut scope quietly rather than tell you it does not fit.
Define acceptance before you ask for prices
Write three to five test cases using real files, each with a clear pass or fail result. For example: given sample assembly A, the tool generates the drawing set in under ten minutes, every sheet passes the standards check, and the BOM matches the ERP item list with no manual edits. Vendors who understand the work will propose a demo against these tests. Vendors who do not will ask you to define them, which tells you something too.
How to compare the responses
Compare quotes on scope before price. Check that every vendor lists the same deliverables and assumptions. Ask each one the same three questions: how will you show progress each week, what do you need from us, and what could make this estimate wrong. A quote far below the others usually means part of the scope was missed, not that the vendor is cheaper. Look for a written risk list and a milestone plan, because both show how the vendor thinks.
Keep the RFQ short
Two to four pages is enough. Long RFQs full of generic legal text get generic proposals in reply. If you need an NDA, send it before any drawings and say so in the RFQ.
Frequently asked questions
Should we share drawings before signing an NDA?
No. Ask for an NDA first. Reputable development partners sign one before they see any customer data.
How many vendors should receive the RFQ?
Three is usually enough. More than five makes comparison hard and slows everyone down.
How long should a vendor take to reply?
For a well-defined RFQ, one to two weeks is a reasonable window. If the scope is still unclear, ask for a short call before a written quote.
Related ENGIMANDI services
CAD Customization, Integration & Automation Across Every Platform · AutoCAD API Development: Custom Plugins with .NET, ObjectARX & AutoLISP · Custom Autodesk Add-in Development
Request a consultation
Share your goal, your users and any systems the software must connect to. Contact ENGIMANDI or WhatsApp +91-9677261485 — an engineer replies with a practical approach, not a sales script.