Most automation projects are approved on enthusiasm. A payback calculation makes the decision testable: how many hours are lost, what they cost, what the build costs and how long until the investment is recovered.
The payback formula
Annual saving = (hours saved per task × tasks per year × loaded hourly cost) + avoided error cost
Net annual saving = annual saving − annual maintenance
Payback (months) = build cost ÷ net annual saving × 12
Worked example (illustrative numbers)
Four engineers each spend 3 hours a week on repetitive drawing updates. That is 12 hours a week, or 624 hours a year over 52 weeks. At a loaded cost of USD 35 per hour, the labour saving is about USD 21,840 a year. Add an assumed USD 2,000 a year for maintenance and a build cost of USD 18,000. The net annual saving is USD 19,840, so the payback is about 11 months.
These are example numbers, not a quote. Replace them with your own measured hours and costs.
Frequently asked questions
How do I measure the hours saved?
Time the current process for a week, or use the last few releases. Record the task, the people and the minutes. Estimates from memory usually overstate the saving.
Should I count errors?
Yes, when errors cause rework, scrap or late deliveries. Use a realistic cost per incident rather than an optimistic one.
What if the payback is longer than 12 months?
Consider a smaller first project on the most frequent task. A faster pilot often has better payback than one large build.